Consultancy for a Feasibility Study to Inform a BMZ (PT) Project Proposal

TERMS OF REFERENCE

Consultancy for a Feasibility Study to Inform a BMZ (PT) Project Proposal

Contracting organization

arche nova (AN)

1. Introduction

arche nova (AN) (www.arche-nova.org), a German non-governmental organization, has since 2012, been supporting vulnerable communities in Kenya to strengthen resilience to climate change, water scarcity, food insecurity, environmental degradation, and recurrent humanitarian shocks. Working at the humanitarian-development-climate nexus, arche nova combines emergency response, disaster risk reduction (DRR), climate adaptation, and sustainable development approaches to build long-term resilience and self-reliance. Together with our local partners working in Kibera; Human Needs Project (HNP) and Action for Social and Economic Progress (ASEP), we are preparing a project proposal for submission to the German Federal Ministry for Economic Cooperation and Development (BMZ). The proposed intervention is envisaged for Kibera, Nairobi County, Kenya.

2. Background

The proposed project; “Strengthening urban resilience through a climate-smart, multifunctional satellite community hub in the Kibera slum, Nairobi, seeks to address interconnected water, sanitation and hygiene (WASH), public-health, climate-resilience and community livelihood needs in Kibera. Objective: To strengthen urban resilience through WASH, income generation and social cohesion in the Kibera slum, Kenya. Target group: 20,000 people, including 55 per cent women, 35 per cent young people (18-25 years) and 10 per cent people with disability. The target groups are closely interconnected with overlapping co-benefits from the project hence a validation of the total beneficiaries reached by the project is necessary. The Junior Partner; HNP also directly benefit from the project through strengthened capacities from the senior partner ASEP.

The project components include construction of a climate-smart community hub for improved access to safe water and sanitation, livelihoods and social cohesion. Potential measures may include a solar-powered water supply, greywater treatment using nano-filtration for reuse e.g. for hydroponic farming, sanitation and bathing facilities, menstrual health and hygiene (MHM), and inclusive community engagement, a digital innovation training lab for green business, entrepreneurship, job placement, and conflict/legal advice. Building on HNP’s ‘Kibera Town Centre’, which successfully operates as a self-sustaining WASH, training and community centre. A senior-junior partnership model is being introduced: as an experienced stakeholder and AN partner, ASEP supports the smaller, locally-rooted organization HNP to facilitate better access to funding, technical support and innovation.

These are options for assessment and are not predetermined technical decisions. The project is structured around four results:

Result 1: Improved access to climate-resilient and inclusive WASH services for vulnerable residents in Kibera.

Result 2: Improved economic empowerment and green skills development for women and youth.

Result 3: Strengthened social cohesion and improved access to community justice services for underserved vulnerable community members.

Result 4: Strengthened institutional capacity and inclusive governance for sustainable service delivery.

A feasibility study is required to verify priority needs supporting the project idea to assess the suitability, affordability and sustainability of proposed measures as well as beneficiary, stakeholder and partner relationships and identify the key risks and recommend concrete adjustments to the project concept, the impact matrix and the planned measures. The study must be independent and sufficiently critical to recommend redesign, deferral or non-selection of any measure where evidence does not support it.

The study should consider applicable BMZ PT requirements and relevant OECD/DAC criteria: relevance, coherence, effectiveness, efficiency, impact and sustainability. Cross-cutting considerations include gender equality, disability inclusion, human rights, environmental and climate safeguards, conflict sensitivity, accountability and Do No Harm.

3. Purpose and Scope of the Assignment

The purpose of the assignment is to provide AN and its partners with an independent, participatory and evidence-based basis for deciding on the proposed intervention and preparing a coherent, technically sound, costed and sustainable BMZ PT project proposal.

The feasibility study will:

4. Methodology

The study should combine qualitative and quantitative methods and follow a participatory approach that reflects the needs and perspectives of intended beneficiaries and relevant stakeholders. The consultant shall propose a rigorous but proportionate methodology in the inception report, triangulating secondary evidence with field-based verification.

5. Tasks and Deliverables

5.1 Tasks

The consultant is expected to undertake the following tasks. The detailed methodology and sequencing will be agreed during inception.

Context and Initial Situation Analysis

  1. Stakeholder and Partner Analysis

Needs, Target Groups and Beneficiary Analysis

Project Concept Evaluation, Design and Recommendations

5.2 Deliverables

The consultant shall submit the following deliverables in English. Due dates will be finalized at contracting and aligned with AN’s BMZ PT proposal-development schedule.

Inception report:  Desk-review summary and evidence gaps; refined questions; justified sampling and respondent-selection approach; stakeholder plan; fieldwork locations and schedule; ethics, safeguarding and data-management arrangements; limitations; draft tools.

Preliminary findings briefing : Emerging findings, evidence gaps, options, key risks and decisions requiring partner input.

Draft feasibility study : Context and problem analysis; needs and target groups; stakeholder and partner analysis; options appraisal; technical and operational feasibility; safeguards; OECD/DAC assessment; risks and sustainability; indicator-by-indicator review with baseline values where feasible and proposed targets.

Project-design annexes:  Draft logical framework matrix; intervention logic/theory of change; indicators and baseline information; implementation timetable; risk register; indicative activity-based budget

Validation and final report:  Validation session with AN and partners; final report incorporating comments; stakeholder contact list, bibliography/source list and curated, captioned photographs where appropriate and consented.

6. Supporting Documents

AN and its partners will provide relevant available documents to support the assignment, which may include:

7. Skills and Experience- consultant profile

AN invites application from Kenya-based independent consultants, teams of consultants or consulting firms. Where a multidisciplinary team is proposed, one team member must act as team leader and take responsibility for the quality and timely delivery of all outputs. The team should collectively demonstrate:

8. Work Plan and Submission

The assignment is expected to be delivered within 21 consultant working days, completed within a period agreed with AN and aligned to the proposal-development schedule. The consultant should propose a realistic allocation of days. The following distribution is indicative:

Fieldwork dates and submission deadlines will be agreed during inception. AN’s review periods and partner feedback must be built into the detailed workplan. Deliverables are complete only after review and acceptance by AN.

9. Management, Coordination, Ethics and Data Management

10. Application Requirements

Applications are invited from Kenya-based individual consultants, teams of consultants or consulting firms, in line with Section 7. Applications must include:

How to apply

Interested applicants are requested to submit their application with the reference “Feasibility Study; arche nova Kenya” clearly indicated in the email subject line to:   kenya.somalia.procurement@arche-nova.org   The deadline for application is 17th November 2026, 23:59 East Africa Time. Applications are reviewed on a rolling basis, so early submission is encouraged. All applications received by the deadline will be considered equally